s·ScreenprintcalcTOOLKITFree tools. No sign-up.

Screen-printing estimating guides

22 practical guides for the numbers behind a print job. Choose a topic, work through an example, and apply it with the tools.

New to estimating? Follow the complete 100-shirt quote example, from measured material inputs to job margin.

10 GUIDES

Pricing & quoting

Build the cost base, choose the right margin, and explain the quote.

Build a quote in the right order

  1. Define the deliverable with the scope checklist.
  2. Separate labor, overhead, and setup before choosing a margin.
  3. Follow the complete 100-shirt cost example, then enter your own numbers in the pricing calculator.

Use quantity-tier guidance when volume changes; use minimum-order guidance when the selling price is fixed. They answer different pricing questions.

Tools: Job pricing calculator · Break-even calculator

Margin vs. Markup for Screen-Printing Quotes

Margin measures profit as a share of selling price. Markup measures profit as a share of cost. Confusing the two can make a quote miss its intended profit target.

Screen-Printing Quote Checklist: Costs and Scope

A useful quote starts with a defined job. Confirm the garment mix, artwork, print locations, and delivery scope before choosing a price. Then allocate each cost once.

How to Allocate Print-Shop Overhead to a Job

Allocate shared shop expenses using a consistent base, such as productive hours. The denominator matters as much as the monthly expense total.

How to Estimate Labor Hours for a Screen-Printing Job

Labor cost depends on how much paid time the job consumes, not just how long the press is moving. Count people and tasks consistently.

How to Check Quantity Discounts on Screen-Printing Orders

A quantity discount is easier to assess when you can show which costs fall per shirt and which remain unchanged. Recalculate the larger order before reducing its unit price.

Minimum Order Quantity: Break-Even and Target Profit

Breaking even and earning a chosen job profit are different thresholds. A minimum order can reflect either, but the calculation needs a stated selling price and cost model.

Screen-Printing Setup Fees: Separate or Bundled?

A setup fee changes how a quote is presented. Whether it changes profitability depends on the total revenue and which costs the fee is meant to recover.

Pricing Mixed Garment Sizes and Styles in One Order

A mixed order needs a weighted blank cost, not a simple average of supplier prices. The weighting comes from the quantities actually purchased.

How Print Locations and Colors Change a Job Estimate

Adding a back print or another color changes the job scope. Cost the added work explicitly instead of assuming a universal surcharge will cover it.

Screen-Printing Cost Example: From 100 Shirts to a Complete Quote

For this constructed 100-shirt job, the modeled cost is $628.50 and a 40% target job margin produces a rounded quote of $1,048. Follow each input to see what is included and what would change the result.

6 GUIDES

Materials & measurement

Keep units, consumption, and purchase quantities consistent.

Measure first, then value the quantity

  1. Choose a blank allowance by garment group.
  2. Measure ink consumption or wet emulsion usage for a comparable setup.
  3. Normalize the price and separate purchased, prepared, and consumed material before entering job costs.

Mesh conversion checks units; it does not select a mesh or predict a material yield. Keep supplier specifications with your measurements.

Tools: Ink consumption calculator · Emulsion coverage calculator · Mesh converter calculator · Waste allowance calculator

6 GUIDES

Job planning & review

Check capacity, scope changes, uncertainty, and the completed job.

Check feasibility and learn from the completed job

  1. For repeat work, confirm what actually remains reusable.
  2. For urgent work, check capacity and incremental expense before choosing a fee.
  3. Record the cause of each cost variance so the next estimate changes for a specific reason.

Contribution per press-hour helps compare constrained capacity. It does not replace a complete job-cost estimate or override delivery commitments.

Tools: Job pricing calculator · Break-even calculator · Waste allowance calculator

Keep calculations close to the job

These guides use constructed examples to explain estimating decisions. Use the calculator directory to run your numbers, or look up a term in the estimating glossary. See the methods and limitations before using the estimates.